| |
![]() |
|
|
Search Results | ![]() |
| |
|
|
|
|
| BTeV-doc-# | Title | Author(s) | Last Updated |
|---|---|---|---|
| 865-v6 | WBS 1.5 Muon Detector Production Plan | Will E. Johns et. al. | 19 Feb 2005 |
| 1036-v3 | WBS 1.5 Muon Detector Installation, Integration & Testing Plan | Will E. Johns et. al. | 19 Feb 2005 |
| 2956-v7 | Muon production tracking and QA talk | Eric Vaandering | 19 Feb 2005 |
| 876-v9 | WBS 1.5 Muon Detector Requirements | Paul D. Sheldon et. al. | 19 Feb 2005 |
| 3779-v1 | Muon Installation Movie | Will E. Johns | 17 Feb 2005 |
| 3478-v11 | Muon (WBS 1.5) Overview for CD2 DOE Lehman Review | Will E. Johns et. al. | 13 Dec 2004 |
| 3121-v2 | WBS 1.5 (Muon) Staged Schedule and Cost | Paul D. Sheldon | 26 May 2004 |
| 2717-v3 | Particle Identification Systems: Muon | Paul D. Sheldon | 16 Apr 2004 |
|
|
|
| Security, Privacy, Legal |
|