Search Results
BTeV-doc-#
Title
Author(s)
Last Updated
2836-v3
A test-stand/test-beam DAQ system for pixel/strip
G. Chiodini
et. al.
26 Jun 2006
2115-v15
BTeV Technical Design Report
BTeV Collaboration
02 May 2005
865-v6
WBS 1.5 Muon Detector Production Plan
Will E. Johns
et. al.
19 Feb 2005
1036-v3
WBS 1.5 Muon Detector Installation, Integration & Testing Plan
Will E. Johns
et. al.
19 Feb 2005
2957-v5
BTeV Document Management and Control
Eric Vaandering
19 Feb 2005
876-v9
WBS 1.5 Muon Detector Requirements
Paul D. Sheldon
et. al.
19 Feb 2005
3263-v2
BTeV Physics, The Staged Detector & Some Physics Reach Comparisons with LHCb
Sheldon Stone
14 Dec 2004
1235-v4
Management Plan for the BTeV Project Office
E. Barsotti
et. al.
11 Dec 2004
3006-v6
WBS 4.0 BTeV Project Risk Analysis
Sheldon Stone
25 Oct 2004
3005-v3
Pixel Detector Overview
David Christian
27 Sep 2004
3261-v1
PAC Report, Aspen, June 2004
Non BTeV Author
14 Jul 2004
3251-v1
Charge to P5 on BTeV's Staged Schedule
Non BTeV Author
09 Jul 2004
3237-v1
Final CD-1 Report
Non BTeV Author
01 Jul 2004
3086-v1
BTeV's Physics Goals and Sensitivities
BTeV Collaboration
20 May 2004
3062-v1
Running in the LHC
Non BTeV Author
11 May 2004
3017-v2
Breakout: Mangement Response to Directors CD-1 Review
Sheldon Stone
27 Apr 2004
3018-v1
BTeV and the Fermilab Program
Non BTeV Author
27 Apr 2004
3012-v1
BTeV Project Management _ Part I
Joel N. Butler
27 Apr 2004
2952-v2
Accelerator physics issues of the C0 IR
John Johnstone
26 Apr 2004
2927-v3
C0 IR plenary talk for Apr '04 Lehman CD-1 Review
Michael Church
23 Apr 2004
2946-v1
C0 IR Installation
Rob Reilly
23 Apr 2004
2937-v1
wbs2.5 -- Controls for the C0 IR
Sharon Lackey
23 Apr 2004
2944-v1
Electrostatic separators and power supplies for the C0 IR
Rodger Bossert
23 Apr 2004
2954-v1
Cryogenic elements for the C0 IR
Jay Theilacker
23 Apr 2004
2945-v1
Power supplies for the C0 IR magnets
George Krafczyk
23 Apr 2004
2936-v1
WBS2.2 - 2005 Conversion of C0 to Normal Straight section
P. Garbincius
23 Apr 2004
2938-v1
Spool Design for C0 Interaction Region
Tom Page
23 Apr 2004
2942-v1
HTS leads for the C0 IR
Sandor Feher
23 Apr 2004
2943-v2
Corrector magnets for the C0 IR
John Tompkins
23 Apr 2004
2941-v1
Cryostat design for the C0 IR quadrupoles
Tom Nicol
23 Apr 2004
2939-v1
Cold mass design for the C0 IR quadrupoles
Fred Nobrega
23 Apr 2004
2924-v6
Mechanical and Integration CD1 Plenary Talk
C. N. Brown
et. al.
21 Apr 2004
2918-v4
Introduction to the BTeV Project
Joel N. Butler
21 Apr 2004
2919-v4
BTeV Tracking System
Simon W. L. Kwan
20 Apr 2004
2925-v2
The BTeV Ring Imaging Cherenkov Detector
Marina Artuso
19 Apr 2004
2914-v2
Overview of BTeV Physics, the Components and the Requirements
Sheldon Stone
19 Apr 2004
2717-v3
Particle Identification Systems: Muon
Paul D. Sheldon
16 Apr 2004
2909-v6
BTeV’s Response to March 30-April 1, 2004 Directors Review Recommendations
Joel N. Butler
et. al.
14 Apr 2004
2910-v1
C0 Outfitting Advanced CDR
Tom Lackowski
14 Apr 2004
Number of documents found: 39
[
DocDB Home
] [
Search
] [
Last 20 Days
] [
List Authors
] [
List Topics
]
[
Fermilab at Work
] [
BTeV Home
] [
BTeV for Physicists
] [
BTeV Search
]
DocDB
Version:
7.6.0, contact
BTeV Document Database Administrators
Execution time:
5 wallclock secs ( 2.69 usr + 0.34 sys = 3.03 CPU)
Security, Privacy, Legal