Fermilab
BTeV Logo Detector Layout & Integration Fermilab
General Information BTeV for the Public BTeV for Physicists BTeV Search

BTeV Detector Layout & Integration Working Group

TEV Integration and IR

The integration and interaction group is in charge of detector parameters and of the interaction region. The leader(s) of this group will represent the collaboration in discussions with the laboratory concerning the collision hall and interaction region. They will be responsible for the preliminary design of the magnet, for the layout of the detector hall and for installation plans.

General charge to the group:

  1. Review the charge below and modify as required.
  2. Interface with the Beams Division in design of the collision hall and the interaction region
  3. Define the magnet parameters and make a plan for installation
  4. Examine machine related backgrounds with help of Beams Division and simulation group.
  5. Investigate beam pipe and support systems for near tracking system
  6. Study target options
  7. Keep track of detector sizes and locations and mediate in case of interference.
  8. Draft official layout of the experimental apparatus.
  9. Investigate and define the necessary support infrastructure for the experimental hall (e.g. cooling, ventilation, cables, etc.)
  10. Define the working group structure (any subgroups?).

Fermilab at Work ]  [ BTeV Home ]  [ BTeV for Physicists ]  [ BTeV Search ]

BTeVWebMaster@fnal.gov
This page last updated: Friday, 26-Jul-2002 14:48:54 CDT
Security, Privacy, Legal Fermi National Accelerator Laboratory